Equipment capacity optimization of an educational building’s CCHP system by genetic algorithm and sensitivity analysis

Authors

1 Department of Mechanical Engineering K.N. Toosi University of Technology, Tehran, Iran

2 Department of Chemical Engineering, College of Engineering University of Tehran, Tehran, Iran

3 Department of Management Islamic Azad University, North Tehran Branch, Tehran, Iran

Abstract

Combined cooling, heating, and power (CCHP) systems produce electricity, cooling, and heat due to their high efficiency and low emission. These systems have been widely applied in various building types, such as offices, hotels, hospitals and malls. In this paper, an economic and technical analysis to determine the size and operation of the required gas engine for specific electricity, cooling, and heating load curves during a year has been conducted for a building. To perform this task, an objective function net present value (NPV) was introduced and maximized by a genetic algorithm (GA). In addition, the results end up finding optimal capacities. Furthermore, a sensitivity analysis was necessary to show how the optimal solutions vary due to changes in some key parameters such as fuel price, buying electricity price, and selling electricity price. The results show that these parameters have an effect on the system’s performance.

Keywords


[1] Ren H., Gao W., Ruan Y., Applied Thermal Engineering (2008)28:514–523.
[2] Sun Z.G., Wang R.Z., Sun W.Z., Applied Thermal Engineering (2004) 24: 941–947.
[3] Lin L., Wang Y., Applied Thermal Engineering  (2007) 27:576–585.
[4] Kishore Khatri K., Sharma D., Soni S.L., Tanwar D., Applied Thermal Engineering  (2010) 30: 1505-1509.
[5] Cockroft J., Kelly N., Energy Conversion and Management (2006) 47: 2349–2360.
[6] Sun Z., Energy and Buildings (2008) 40: 126–130.
[7] Fumo N., Mago P. J., Chamra L. M., Applied Energy (2009)8:928–932.
[8] Ehyaei M.A., Bahadori M.N., Energy and Buildings (2007)39:1227–1234.
[9] Liu M., Shi Y., Fang F., Applied Energy (2012)95:164–173.
[10] Mago P.J., Chamra L.M., Ramsay J., Applied Thermal Engineering (2010) 30: 800–806.
[11] Kanoglu M., Dincer I., Energy Conversion and Management (2009) 50:76-81.
[12] Silveira J.L., Tuna C.E., Progress in Energy and Combustion (2003)29:479–485.
[13] Marques R. P., Hacon D., Tessarollo A., Parise J. A. R., Energy and Buildings (2010) 42:2323–2330.
[14] Rosen M.A., Le M.N., Dincer I., Applied Thermal Engineering (2005) 25:147–159.
[15]  Basrawi M. F. B., Yamada T., Nakanishi K., Katsumata H., Energy (2012)38:291-304.
[16]  Ghaebia H., Saidia M.H., Ahmadi P., Applied Thermal Engineering (2012) 36: 113-125.
[17]  Sayyaadi H., Abdollahi G.. Energy and  Buildings (2013) 60:330–344.
[18]  Wang J., Jing Y., Zhang C., Applied Energy (2010)87:1325–1335.
[19] Wu D.W., Wang R.Z., Progress in Energy and Combustion (2006) 32:459–495.
[20] Sanaye S., Aghaei M., AbaddinShokrollahi S., Applied Thermal Engineering (2008) 28: 1177-1188.
[21]  Sun Z.G., Wang R.Z., Sun W.Z., Applied Thermal Engineering (2004) 24: 941–947.
[22]  Hashemi R., Transactions on Energy Conversion (2009) 24: 222-229.
[23] Sanaye S., Ardali Raessi M., Applied Energy (2009) 86: 895–903.
[24]  http:// www.tavanir.org.ir, Tavanir Org.